Agricultural Cooperative Crop Planning Under Weather and Market Uncertainty

ISYE 671 — Linear Optimization and Network Flows


Background

The Prairie Growers Cooperative (PGC) is an agricultural cooperative of 12 member farms in north-central Illinois with a combined 18,000 acres of cropland. Each spring, PGC must decide how many acres of each crop to plant across its member farms. These planting decisions must be made before the growing season, when two critical factors remain uncertain: (1) weather conditions (which affect crop yields) and (2) commodity market prices at harvest time.

PGC has historically relied on rules of thumb and individual farmer judgment. After a disastrous 2024 season in which over-commitment to a single crop led to significant losses, the cooperative’s board has engaged you to develop a two-stage stochastic linear programming model that explicitly accounts for uncertainty in yields and prices, and determines a planting plan that maximizes expected profit.


Problem Data

Crops

PGC considers four crops for the upcoming season:

Crop Abbreviation Planting Cost (\(/acre) | Harvest Cost (\)/acre) Min Acreage Max Acreage
Corn CR 420 65 4,000 10,000
Soybeans SB 280 45 3,000 9,000
Winter Wheat WW 210 45 1,000 5,000
Cover Crop (conservation) CC 90 0 500 4,000

Total available acreage: 18,000 acres. All acreage must be planted (fallow land is not permitted under conservation compliance requirements).

Cover crops generate no harvest revenue. Instead, they provide a soil health credit of $45/acre regardless of weather (a government conservation payment).

Crop rotation constraint: To maintain soil health, no more than 55% of total acreage can be planted in corn (CR). Soybeans (SB) must occupy at least 20% of total acreage.

Uncertainty: Scenarios

PGC’s agronomist and market analyst have developed 6 scenarios representing combinations of weather and market conditions:

Weather conditions (3 levels):

Weather Probability Description
Favorable (W1) 0.30 Adequate rainfall, no extreme heat
Normal (W2) 0.45 Typical conditions, minor stress periods
Adverse (W3) 0.25 Drought or excessive rain, pest pressure

Market conditions (2 levels):

Market Probability Description
Strong (M1) 0.40 High commodity prices, strong export demand
Weak (M2) 0.60 Lower prices, adequate domestic supply

Weather and market conditions are assumed independent, giving 6 scenarios:

Scenario Weather Market Probability
s1 W1 (Favorable) M1 (Strong) 0.12
s2 W1 (Favorable) M2 (Weak) 0.18
s3 W2 (Normal) M1 (Strong) 0.18
s4 W2 (Normal) M2 (Weak) 0.27
s5 W3 (Adverse) M1 (Strong) 0.10
s6 W3 (Adverse) M2 (Weak) 0.15

Yield by crop and weather (bushels per acre):

Crop W1 (Favorable) W2 (Normal) W3 (Adverse)
CR 210 180 120
SB 62 52 35
WW 78 65 50

Market price by crop and market condition ($/bushel):

Crop M1 (Strong) M2 (Weak)
CR 6.80 4.20
SB 15.50 10.20
WW 8.20 5.40

Second-Stage (Recourse) Decisions

After the growing season, once weather and market conditions are known, PGC must decide how to sell its production. There are two selling options:

  1. Immediate sale: Sell all production at the realized spot market price. Revenue = yield × acres × price.

  2. Contract sale at a discount: Before the season, PGC can commit a portion of expected production (up to 50% of normal-weather expected production) to a pre-season contract at a guaranteed price equal to 85% of the average market price (average of Strong and Weak). The contract volume is a first-stage decision. If actual production falls short of the contracted amount, PGC must purchase on the spot market at 115% of the realized price to fulfill the contract.

Any production beyond the contract volume is sold at the realized spot price.

Additional Costs


Your Assignment

Part 1: Model Formulation

Formulate a two-stage stochastic linear programming model.

  1. Stage structure: Clearly define:

    • First-stage decisions (before uncertainty is resolved): acreage allocation for each crop, contract sale volumes.
    • Second-stage decisions (after scenario realization): spot market sales, any shortfall purchases to fulfill contracts.
  2. Decision variables: Define all variables with appropriate indices. First-stage variables have no scenario index; second-stage variables are indexed by scenario \(s\).

  3. Objective function: Maximize expected profit across all scenarios: \[\max \quad -(\text{first-stage costs}) + \sum_{s} p_s \cdot (\text{second-stage net revenue in scenario } s)\] Write out each cost and revenue component explicitly.

  4. Constraints:

    • Acreage allocation: total = 18,000; individual crop bounds; rotation constraints
    • Contract limits: cannot contract more than 50% of normal-weather expected production
    • Production by scenario: \(\text{production}_{c,s} = \text{yield}_{c,w(s)} \times \text{acres}_c\)
    • Sales balance: contract delivery + spot sales = production + shortfall purchase (per crop, per scenario)
    • Shortfall definition: shortfall ≥ contract volume − production (per crop, per scenario)
    • Non-negativity
  5. Linearity: Confirm that this formulation is a linear program (no binary or integer variables). How many variables and constraints does the model have?

  6. Assumptions: Document all assumptions, particularly the independence of weather and market, and the contract mechanism.

Part 2: Implementation and Solution

Implement the model in AMPL/Gurobi in a Google Colab notebook.

  1. Solve the stochastic model and report:
    • Optimal first-stage decisions: acreage by crop, contract volumes.
    • Expected total profit.
    • Second-stage decisions for each of the 6 scenarios.
  2. Value of the Stochastic Solution (VSS):
    • Solve the expected-value (EV) problem: replace all random parameters (yields and prices) with their probability-weighted expectations. Record the EV first-stage decisions.
    • Compute the EEV: fix the first-stage variables to the EV solution and re-solve under the original 6 scenarios. Report the expected profit.
    • VSS = (Stochastic solution objective) − EEV. Interpret the result.
  3. Expected Value of Perfect Information (EVPI):
    • Compute the wait-and-see (WS) solution: solve a separate deterministic problem for each of the 6 scenarios (as if you knew the outcome in advance), then compute the probability-weighted average profit.
    • EVPI = WS − (Stochastic solution objective). Interpret: what is the maximum PGC should pay for a perfect forecast?

Part 3: Scenario Analysis and Recommendations

  1. Profit distribution: Compute the profit for each of the 6 scenarios under the optimal stochastic solution. Create a bar chart showing the profit distribution. What is the worst-case scenario profit?

  2. Weather sensitivity: Re-solve the model with the adverse weather probability increased from 0.25 to 0.40 (reducing favorable to 0.15 and normal to 0.45). How does the optimal planting plan change? How much does expected profit decline?

  3. Contract strategy analysis: Solve the model with no contracts allowed (all sales at spot price). Compare expected profit and profit variability to the baseline model. Is the contract mechanism valuable?

  4. Advisory memo: Write a 1-page memo to the PGC board that includes:

    • The recommended planting plan and contract strategy.
    • Key risks and how the plan manages them.
    • The value of improved weather forecasting (EVPI) and whether it is worth investing in.
    • Recommendations in accessible language — board members are farmers, not optimization specialists.

Deliverables